Operational readiness for a mixed-use giga-project district

The challenge

The developer faced a phased opening with no FM input in design, incomplete handover data and no operating model for the first district.

Our approach

We reviewed designs for maintainability, specified BIM-to-FM data, planned mobilization backwards from opening and ran a soft-landings programme.

Results

The district opened fully operable on day one, with asset data loaded into the CAFM before handover.

[40+]
Design maintainability changes
[96%]
Asset data accuracy at handover
Day 1
Operational on opening