Operational readiness for a mixed-use giga-project district
The challenge
The developer faced a phased opening with no FM input in design, incomplete handover data and no operating model for the first district.
Our approach
We reviewed designs for maintainability, specified BIM-to-FM data, planned mobilization backwards from opening and ran a soft-landings programme.
Results
The district opened fully operable on day one, with asset data loaded into the CAFM before handover.
[40+]
Design maintainability changes
[96%]
Asset data accuracy at handover
Day 1
Operational on opening